TitleProduct

2-Tier Creative Fruit Basket

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2021-01-20 14:07

  • Browse the number:

    302

Send an inquiries
+
Shenzhen Lanejoy Technology Co., Ltd
Contactaixin:

lanqiaoy(Mr.)  

Email:

telephone:

phone:

Arrea:

Guangdong

Address:

Floor 3-4, No.2 Workshop, No.30 Of Dabu Tongchang Road, Longdong Community, Baolong Street, Longgang District, Shenzhen, Guangdong, China

Website:

http://www.lanejoy-machining.com/ http://lanqiaoy.zq-steel.com/

+

High quality stainless steel double fruit basket manufacture basket fruit stainless steel gold


This product is made of 304 stainless steel, very simple, durable, and easy to clean.Easy to use in family gatherings, group activities, outdoor camping and other barbecue activities indispensable fun of life.


Food Grade Stainless Steel: The fruit basket made of high quality 304 stainless steel, This kind of material steel luxury, never rust, resist corruption, easily clean, safe, healthy and durable. Prevent rust or chemicals from contaminating food and damaging health

Muti-functional Fruit Basket: The fruit bowl can be used to place fruit basket, vegetables, bread, candies, snacks, etc. in the kitchen, restaurant, bar, etc., and it can also be used in the bathroom to store towels and bath products. It can also be used in the bedroom and the living room to store messy little things. 


Material

304 stainless steel

Finish

Bare/Polished

Sample

Available

ODM/OEM

Accepted

MOQ

100pcs per item

Wire diameter

20MM-40MM, and custimized

Shape

Round, square, rectangle or customized

Delivery time

Within 2-20 days working days after receiving your deposit

Payment terms

T/T, Paypal, West Union, Trade Assurance

Packing

In generally, plastic bag + carton box + plywood pallet (custom it as your requirement)


Lead Time:

Quantity (Pieces)

1 - 50

51 - 200

201 - 1000

>1000

Est. Time (days)

10

12

15

To be negotiated






http://www.lanejoy-machining.com/